Showing posts with label Tidal Power. Show all posts
Showing posts with label Tidal Power. Show all posts

Wednesday, March 15, 2017

WHAT DO YOU THINK NOW? Bay of Fundy Tidal Turbines will Kill Marine Life and Impact Our Eco-economics 2009

ORIGINALLY PUBLISHED IN 2009.
What do you think about this now?

***************************************************************************************************

Turbines perilous to marine animals
SeaGen - world's first commercial tidal genera...Image via Wikipedia
By MICHAEL DADSWELL
Wed. Sep 23 - 4:46 AM

There are misconceptions concerning the turbines that will be used to extract energy from the Bay of Fundy tides and these need addressing. Tidal power from free-running, propeller driven generators is not a free energy gift. There will be environmental costs extracted from the fisheries and tourism of Nova Scotia, which your readers should know.
I have been studying the effects of tidal power on fish and fisheries since 1980 when it became apparent a tidal power plant would be installed at Annapolis Royal. Yes, I am a biologist, but I have consulted with many physical scientists and engineers over the last 29 years during my studies on hydraulic turbines. These include George Baker, an engineer and the former vice president of the Nova Scotia Tidal Power Corporation, who was primarily responsible for the design and construction of the Annapolis Royal tidal power plant. In fact, Mr. Baker funded our work over a period of 10 years because he also wished to know effects of these turbines on fish. What we found was not pretty!

During our studies at Annapolis Royal, we found there was a dramatic impact on the fishes using the Annapolis River estuary. Impacts, which continue today (see blog of the Annapolis Royal Heritage Society Sept. 8, 2009 concerning dead sturgeon found below the generator), were spread across the entire community of fishes.

Francis Jordan asked for the numbers, so here they are. We found that 40 per cent to 50 per cent of the small, out-migrating juvenile fishes (shad, gaspereau, herring, 10 cm long) were killed by turbine passage. Death was mainly by pressure flux and shear around the turbine blades.
Large fishes were mainly injured or killed by turbine blade strike. Experiments with acoustic-tagged adult shad (50 cm long) found that 20 per cent to 25 per cent were killed from a single pass. Larger fishes such as striped bass and sturgeon (one to two metres long) were often found cut in half and many gaspereau, mackerel, flounders, eels and other species were killed or maimed.

Our findings were published in peer-reviewed, scientific journals. If Mr. Jordan does not believe me, then contact the graduate students who worked on the project, many of whom are now university professors or fisheries scientists with the government.

All turbines proposed for the Bay of Fundy and discussed in the environmental assessment released by tidal power proponents in July are generically similar to the Annapolis Royal turbine. They are hydraulic lift turbines that work by Bernoulli’s Principle (which allows airplanes to fly).
Blade design generates lift from the flow of water over them, making the turbine turn and similar physical effects (pressure flux, shear, strike) will occur in these units and harm marine organisms. The problem is there are many more fishes passing through the Minas Channel. They will encounter the turbines more often because the planned turbines will generate in both directions of the tide (Annapolis only generates on ebbing tide), and the open Bay of Fundy contains many marine mammals, including seals and whales with larger body sizes, (two to 20 metres), making probability of blade strike high.

There is little difference between ship propellers and tidal turbines: both work because of Bernoulli’s Principle. The saving grace of ships’ propellers is that most are much smaller than the turbines. If you do the math, a 15-metre diameter tidal turbine turning at the RPMs outlined in proponent’s environment assessment actually have blade tip velocities of 34 to 62 km/h. Few fish or whales can swim that fast and avoid the blades, especially smaller species.
Having said that, every year fish and whales turn up dead on beaches around the Maritimes having been killed by ships’ propellers. Ships may not leave a trail of fish carcasses behind them, but they do kill some of the marine fauna. Ask whale biologists what they think.
My contention is that the large-scale development of tidal power in the Bay of Fundy will do immense damage to the fisheries and whale-watching businesses in the Maritimes. Please remember fisheries and tourism are two of our larger economic engines. Why replace one renewable resource with another when we can obtain it from other sources (wind, solar)? Hydroelectric turbines have done immense damage already to the fisheries resources and tourism of the Maritimes. Remember all the Atlantic salmon rivers we have lost to hydroelectric power generation.

Michael Dadswell is a biology professor at Acadia University
.

Tuesday, May 14, 2013

FUNDING: Community and Business Toolkit for Tidal Energy Development

English: Bay of Fundy © 2004 Matthew Trump
English: Bay of Fundy © 2004 Matthew Trump (Photo credit: Wikipedia)
ATEI is Pleased to Announce Release of the Community and Business
Toolkit for Tidal Energy Development.

Click here
<http://tidalenergy.acadiau.ca/community-business-toolkit-.html>to learn
more and download a
copy (http://tidalenergy.acadiau.ca/community-business-toolkit-.html


In June 2011, the Nova Scotia Utility and Review Board (UARB) announced
Community Feed-In Tariffs (COMFIT) for various renewable energy
developments, including small-scale tidal energy. This innovative
government policy gives communities/developers a long-term, guaranteed
price for electricity generated from renewable resources. The UARB also
announced that feed-in tariffs for large-scale tidal energy would be
forthcoming.

However, many question remain around how communities and businesses in
Nova Scotia can benefit from tidal energy development. To address some
of these questions the *Acadia Tidal Energy Institute,* with support
from municipal, provincial and federal partners, has developed the
*Community and Business Toolkit for Tidal Energy Development.* The*
Community and Business Toolkit for Tidal Energy Development *will assist
communities and businesses in better understanding the opportunities
stemming from tidal energy while encouraging responsible harvesting of
the tidal energy resource.

The* Community and Business Toolkit for Tidal Energy Development
*contains a series of modules that describe opportunties and strategies
for communities and businesses to become involved in tidal enegy
development. The modules also provide relevant advice, checklists and links.

*The Entire Toolkit and Individual modules can be downloaded from the
links below.*

Dana Morin
/Director-Business Development/**
*Fundy Tidal Inc.*
121 Second Street
Westport, Nova Scotia, B0V 1H0
Office: (902) 839.2078
Cell: (902) 790.3565
www.fundytidal.com <http://www.fundytidal.com/>

*Marine Renewables Canada, www.marinerenewables.ca <www.oreg.ca>*

/Aligning industry, academia and government to ensure that Canada is a
leader in providing ocean energy solutions to a world market.
/*Fundy Energy Research Network (FERN), fern.acadiau.ca
*/Fostering Collaborations in Tidal Energy Research/

Friday, June 4, 2010

Some question financial reality of tidal power in NS

Get the pictures and subscribe at: http://fundytides.blogspot.com

Don’t miss boat on tidal energy

By RON SCOTT
Wed. Jun 2 - 4:53 AM


The United Kingdom and Canada are the world leaders in exploring the potential of harnessing the energy from the flow of tidal currents.

The U.K. is very excited by what they have learned from the three tidal turbine demonstration projects they have installed to date. As a result, they plan to install a tidal energy capacity of one gigawatt by 2020 — enough to supply the energy needs of approximately 300,000 homes. The U.K. is keen to take advantage of its impressive tidal regimes, decrease its carbon footprint, and reduce its dependence on non-renewable energy imports.

Scotland has been particularly aggressive. It is showing the way by granting six developers under-sea real estate permits in exchange for promises to build a tidal generation capacity of 600 megawatts (180,000 homes) by 2020 in the Pentland Firth area. The U.K.’s one-gigawatt target looks quite achievable when its interim plans to install tidal farms in Wales and the Channel Islands are added to the Scottish initiative.

Canada has had a great start, having installed demonstration turbines at Race Rock in B.C. and in waters off Nova Scotia in the Bay of Fundy. As yet, however, there are no Canadian plans to commercialize tidal energy generation. Canada’s Ocean Renewable Energy Group (OREG) claims that, given our progress, we could reasonably expect to build a capacity of around 600 megawatts by 2020. Much of that capacity could be in Nova Scotian waters.

Nova Scotia’s recently announced Renewable Energy Plan has recognized this potential. The plan calls for a task force "to develop strategies for commercializing marine renewable energy." It has also authorized "feed-in-tariffs (incentives) for developmental tidal arrays that reflects the cost of the turbines and their deployment."

And it will develop marine renewable energy legislation so that licensing procedures are defined and environmental protection and resource conservation are in place. This kind of support will encourage the financial community to invest in Nova Scotia tidal energy projects.

Still, we must act quickly to further define the true extent of our tidal energy opportunity, set tidal energy targets, and finalize the specifics of the permitting procedures and feed-in tariffs. Otherwise, other jurisdictions will step in and we will miss the window of opportunity that is open to us.

Timely action will permit Nova Scotia, like Scotland, to build on its current leadership position. If we take this action, we can look forward to the day when a significant ocean energy industry becomes a reality in Nova Scotia. It is a vision that is within our grasp.

Ron Scott is president of Maritime Tidal Energy Corporation.

COMMENTS
(2)



POST YOUR COMMENT

Frank wrote:
I would like to see tidal energy become a reality, as much as anyone, but these guys are going to have to get their act to-gether, here they are talking about "feed-in tariffs" meaning this is high cost power, meaning either power rates or taxes go up, economic development is stifled and people lose jobs. How aout these guys going back to the drawing board and get competitive, then we will have another look at the option.

BruceMcC wrote:
To Frank: I appreciate your concern about rising electricity rates, but the reality is that during the period of feed-in tariffs tidal energy will only represent a small fraction of the 2300MB capacity that NS power currently has. Let's say that by 2020, we have 23MB of tidal power, that would represent only 1% of the total. Let's say the initial feed-in tariff for tidal is $0.25/kWh - or let's say $0.25612/kilowatt, as that is $0.14 more than my residential rate of $0.11612. More than double - but it represents only 1% of the total, and so rates go up only by $0.0014 to $0.111752, or an extra $0.14 on a $100 bi-monthly invoice. By the time tidal energy represents a significant fraction of the installed capacity, two things will have happened (1) The costs of setting up tidal energy will have declined, so the feed-in tariffs will be decreased* and (2) the price of other forms of energy will have increased. *that is why they are called "feed-in". They are a subsidy, of limited duration. One last comment - our tax dollars are routinely used to provide significant subsidies to oil and gas companies. We just don't see this drain on our pocket book quite so easily.

Saturday, February 20, 2010

Groundbreaking Tidal Power Technology to be Tested in Cobscook Bay

Get the pictures and subscribe at: http://fundytides.blogspot.com
http://www.democraticunderground.com/discuss/duboard.php?az=view_all&address=115x231607
02/18/2010 Reported By: Anne Mostue

A Portland-based tidal power company unveiled its latest underwater turbine structure today in Bangor. It's the largest ocean energy device to be deployed in U.S. waters, and it will be submerged in Cobscook Bay early next month.



Eastport continues to be the hub for some of the most advanced tidal power research in the country, according to the Portland-based Ocean Renewable Power Company and the University of Maine.

"Cobscook Bay and Western Passage, which are on either side of Eastport, are the best tidal energy resources on the east coast of the U.S., so that's why we're there," says Christopher Sauer, CEO of Ocean Renewable Power Company, which is developing tidal power projects in Maine, Alaska and Florida.

Sauer contracted Stillwater Metalworks of Bangor and Harbor Technologies of Brunswick to build its latest turbine, nicknamed Energy Tide 2 (pictured above). "It's going to be at the end of deployment arms that are at the side of a barge and it's going to be lowered in underneath the barge and it will be about 25 feet below the surface," he says. "And the barge is going to be moored in Cobscook Bay, just off from an area called Shackford Head. So actually, interesting, as you drive into Eastport, at one point as you're coming into town you'll actually be able to look over and see it."

The device is made up of a rectangular framed box containing a 10,000-pound generator and turbine blades. It looks like a giant push-reel lawnmower - 46-feet wide by 11-feet tall, and 14-and-a-half feet deep. "It's the largest Ocean Energy Device ever deployed in U.S. waters," Sauer says. "It's rated, designed for a maximum capacity of 60 kilowatts, so that's the largest yet done in the United States. Now in Europe and other places they have done bigger, but in the U.S. this is the biggest."

Monday, November 2, 2009

Bay of Fundy Turbines will produce "Red Energy" not "Green Energy" - Dadswell



From the Working Waterfront. Read the entire article here: http://www.workingwaterfront.com/online-exclusives/Parallel-44-Tidal-power-takes-two-steps-forward/13496/


Tidal power also has to prove what most have assumed: that devices will have no discernable effect on the environment or fish populations. Mr. Sauer says video monitoring during the year-long testing of their prototype indicated marine life never attempted to enter the turbines. "Fish can sense a sold object ahead and appear to swim around it," he says.
Not everyone is convinced, least of all Mike Dadswell, a professor of biology at Acadia University in Wolfville, Nova Scotia, which is located near the Minas Basin test area. In July he wrote Nova Scotia officials that the test project there had the potential to kill large numbers of fish that migrate to the head of the Bay of Fundy. "Tidal energy will not be ‘Green Energy" but rather ‘Red Energy' from the blood of its victims," he wrote.

"It's literally impossible to turn a blade in the water and not kill, maim, or harm some fish," says Dadswell, who has conducted extensive monitoring of fish kills at an old-fashioned dam-based tidal power plant at Annapolis Royal, Nova Scotia. At that 25-year old facility, sturgeon, herring and other fish wishing to travel to and from the Annapolis River are forced to swim through concrete tubes and the spinning generator blades, which kill by impact and pressure changes.
He says the Minas Basin turbines operate on the same physical principles and will also kill many of the fish that swim through them. If 200 to 300 devices are eventually deployed as supporters hope, the damage could be devastating to fisheries throughout the Bay of Fundy.  "The fish aren't forced to go through the turbine there, so it all comes down to fish behavior, whether fish approaching these machines will know to turn away," he says. Proponents say Dadswell's conclusions drawn from an old dam-based system don't apply to the new devices, which fish are free to swim around. "With these devices there's no sucking and none of that-the physics are totally different than at Annapolis Royal," says Sauer. "You have a little itty-bitty piece of equipment in a huge area of water with no physical pressure pulling things into it."

Sunday, September 27, 2009

Beware the Call of Bay of Fundy's Sirens

Get the pictures and subscribe at: http://fundytides.blogspot.com



 Oil, coastal quarries, nuclear power, LNG, tidal power ... the call of Bay of Fundy Sirens has become louder and more persistent with each passing year. Even the proven natural wealth of this place and those special niches like the Quoddy Region fall under the spell of this insistent chorus that promises jobs and wealth.

Indeed, we seem unable to learn from our neighbours and friends. Read this familiar sad story from Alaska:

In the early 1970s, Big Oil wooed Alaskans with a seductive chorus promising jobs, riches, and risk-free oil development, pipeline transfer, and tanker transport. Alaska politicians fell under its spell.

Today Big Oil generates more than 85 percent of Alaska's operating revenues - and the song has changed. The tune is now militant and strident, as the industry demands ever more opportunity to drill and ever less regulation. This "opportunity" comes at the expense of deeply rooted indigenous cultures, family lifestyles, and businesses like commercial fishing and tourism that rely on Alaska's abundant natural resources.

But the same enchanting Siren music once tailored to Alaskans is currently playing for Floridians, Californians, and others who live on our seacoasts. From my perspective as a survivor of North America's largest oil spill--the 1989 Exxon Valdez--it seems too many politicians are falling under its spell. My advice to coastal residents in the Lower 48: Take heed.

We learned the hard way that Big Oil's promises were good only until authorizing laws were passed and permits approved. The industry promised, for instance, in the early 1970s to double hull its tankers to minimize the risk of spills. But it will take until 2015 - more than 40 years - for it to make good on this promise. That's too late for those of us in Prince William Sound. Ironically, too, 2015 will arrive long before the last of the toxic oil that spilled from the single-hulled Exxon Valdez is gone from our beaches--and long before our herring even begin to recover.

The once thriving multi-million dollar herring fisheries are nonexistent and the wildlife that feed on herring--well, it will recover whenever the herring recover. Maybe. Scientists make no promises.


It's worth reading the entire article here: Huffington Post, Posted: September 25, 2009 10:43 AM, Beware the Sirens of Big Oil http://www.huffingtonpost.com/riki-ott/beware-the-sirens-of-big_b_299809.html

Photo Credit Odysseus and the Sirens: wikipedia.com
Thanks to Vivian N.

Monday, May 4, 2009

Province softening stance on LNG tankers in Passamaquoddy Bay























Premier Shawn Graham assures the people of Charlotte County of his support in their opposition to LNG in Passamaquoddy Bay. (Art MacKay Photo 2005)


I maintain that the position of the Government of New Brunswick has never been firm and that they have been walking a middle of the road public position with their interest in big business and political power groups taking precedence over their obligation to their constituents.

Unless they have been hiding under a rock these last few years, the Graham Government should be well aware of the position of the people of coastal Charlotte County and the reasons for their opposition to the development of ANY heavy industry in Passamaquoddy Bay, West Isles and Head Harbour Passage. If they are not, they are ignorant of the true enovironmental AND economic importance of this area; not to mention the importance of the natural resources that will become vital as we continue to experience global collpase of the oil industry and increased costs of food distribution.

With the proposed developments in tidal power in Head Harbour Passage the future looks bleak for this national treasure and the near billion dollar economy that this unique ecosystem supports.

Art

Last Updated: Monday, May 4, 2009 | 6:52 AM AT Comments1Recommend2

The New Brunswick government has toned down its rhetoric when it comes to opposing the construction of liquefied natural gas terminals on the U.S. side of Passamaquoddy Bay.

Energy Minister Jack Keir said the province is not opposed to the terminals and will let the U.S. Federal Energy Regulatory Commission process unfold.

The province, he said, has always backed the regulatory process that will decide the fate of any planned LNG terminals in Maine.

"If the federal government, both federal governments, suggest that it is a safe and reliable terminal then everybody is in agreement on that. But the process has to take place," he said.

The federal government has strongly opposed LNG tankers in Passamaquoddy Bay and Michael Wilson, Canada's ambassador in Washington, delivered a diplomatic note in February 2007 to the U.S. Federal Energy Regulatory Commission, citing safety and environmental concerns.

The letter said Canada, to protect the environment, will not permit tankers to sail through the narrow passage between New Brunswick's Deer and Campobello islands.

The government of Premier Shawn Graham said it supported the federal government's position.

"We are opposed to tanker traffic through the Passamaquoddy Bay. And our intervener status will ensure that those concerns are addressed appropriately," Graham said at the time.

The province has enlisted a Washington law firm to intervene in the U.S. regulatory process on behalf of the people of New Brunswick.

Group concerned about tone change

Jessie Davis, who heads Save Passamaquoddy Bay Canada, a group opposed to the development of LNG terminals on the bay, said she is surprised at the way Keir describes the province's position.

She said a delegation from her group went to Fredericton to meet with provincial officials two weeks ago.

"They were extremely clear at that time. They strongly oppose the terminals," she said.

Davis said her group has been assured the lawyers working on behalf of the province are still intervening against the terminals.



Get the pictures and subscribe at: http://fundytides.blogspot.com

Wednesday, April 29, 2009

Bay of Fundy - Harnessing the power of the sea


Get the pictures and subscribe at: http://fundytides.blogspot.com

Story by Sector Northern New England

Click here for link to YouTube video of the press conference

Being stationed at the most northern Coast Guard station on the East Coast certainly has its share of challenges. For one thing, the water temperature this winter averaged 37 degrees and the rocky coast is unforgiving to careless or unlucky mariners. But perhaps the greatest challenge of all is dealing with the sheer force of the water brought in by the 22-foot tides and six knots of current that flow through the deep channels of the St Croix River.

The Old Sow, a geological feature off Eastport, is home to the largest tidal whirlpool in North America. Extreme tides and bathymetry help create a unique vortex that can create a 10-foot depression on the water's surface as millions of gallons of water flow quickly past Eastport. For the Coast Guard men and women in Eastport, the extreme challenges of nature bring only one response--if you can't change it, use it. So personnel at Sector Northern New England found themselves asking, why can't we harness the immense and predictable power of the tides to power the Coast Guard facilities here?

So it is fitting that on Earth Day, Sector Northern New England, in a partnership with the Coast Guard Research and Development Center in New London, Conn., announced a plan to test tidal generators off Station Eastport.

"With 22 Coast Guard units guarding an area spanning over 5,000 miles of coastline, Sector Northern New England strives to be good stewards of the environment and the taxpayer's money as we serve the public every day," said Capt. James McPherson, commander of Sector Northern New England. "As protectors of the environment, we feel a special responsibility to pursue renewable energy sources to help decrease our dependency on fossil fuels, seeking to keep the coast clean and beautiful."

Through federal funding, $100,000 has been made available for qualified industry experts to develop and test in-stream tidal equipment this summer. McPherson said the reaction from the local community has been extremely supportive and the Maine state and congressional delegation participated in the Earth Day press event at Coast Guard Station South Portland. Sector personnel wanted fast action so the proposals are intended to test actual generators in the extreme currents and tides. McPherson added that once completed, the station would be the first federal facility in the continental U.S. to use tidal power.

"Most people are aware of the Coast Guard's role in protecting the marine environment, but we also have responsibilities to the taxpayers too," said McPherson. "Nature provides other opportunities for New England units and solar and wind power are part of the plan."

Other projects Sector Northern New England has initiated include wind turbine installations at the South Portland and Southwest Harbor facilities that power computers, servers and monitors at a combined 365 kilowatt hours per month, and 360 lighted buoys and 60 light houses that are energized by solar panels.

"These efforts will continue to save taxpayer's money and protect the environment," McPherson said. "Every day is Earth Day for the Coast Guard."